Project picks / Spaces
Brief introduction of projects based on Multibeam structures. All the projects are designed to use mainly Multibeam stock parts.
​
Kupoli (Dome)
Multibeam Dome structure was designed initially as a prototype for big span hall made with Multibeam. The reference structure was ordered as see-through installation with polyglass pvc covers and to serve 1500 capacity audience. It’s span is 32 meters, and top height around 11 meters. Dome has 10t load bearing capacity in the roof and wind resistance of 28m/s. Dome can take snowloads and the size (diameter) can be adjusted per need.
Event stage 12x9
The stage is ultimately designed to work as a seasonal installation for longer periods in all-round weather conditions. The stage is a heavy duty solution and has wind resistance of 28m/s and snow load capacity can be installed. Due to 3x3m modularity, the width and depth along with height can be adjusted per need. The roof has basic load bearing capacity of 12 tons, but can be adjusted to meet the requirement (up or down). The stage roof and walls can be covered with any suitable material. Wings for LED screen or soundsystem, side areas & ramps can be customized.
2nd floor
The 2-storey structure is designed for quick assembly and dismantle for all kinds of custom solutions / promotional stands, and it can be covered with any kind of material or ie. led screens. The 2nd floor load capacity is designed for 300kg/m2 and 500kg/m2 solutions, but can be adjusted to higher capacities in case of need. Basic counterweight is integrated below the first floor. The floor area width and depth can be adjusted within metric system and the structure can be designed as 3-storey structure. The frame application in picture is designed for client use.
Kota 9x9m
Kota is triangle shaped structure that is based on Multibeam 3x3 modular system and integrated counter-weight system for 28m/s wind resistance. Kota is highly adjustable eye-catching structure that has limitless possibilities for its use. Kota is quick to assembly and dismantle and can be covered with any kind of surface material. Project was executed in 2023.